Dear community
The environment:
- vCenter 6.7
- two ESXi 6.7 in a HA Cluster
- Network connectivity:
- Host1 (one Uplink)<-> Switch1 <-> Destination
- Host2 (one Uplink)<-> Switch2 <-> Destination
- Two VMs
- All VMs are placed on Host1
Goal: if Switch1 or the Uplink of Host1 to Switch1 fails, failover of all VMs would be happened to Host2 to restore the connectivity.
How can it be done? With HA or Fault Tolerance?